When homeowners ask for “ADU plans,” they usually picture a floor plan. To get a building permit, the city needs a full, coordinated set: drawings, engineering, energy reports and forms that all agree with each other. Here is what a permit-ready set includes in LA County and Orange County.
The drawings
- Title sheet: project data, zoning and floor area numbers, the scope of work and whether the building is sprinklered
- Site plan: property lines, setbacks, the existing house, the new ADU, utilities and drainage
- Floor plans: dimensions, doors and windows, smoke and carbon monoxide alarms
- Exterior elevations and building sections
- Roof plan, including the solar-ready area where it’s required
- Foundation plan, framing plans and structural details
- Electrical, plumbing and mechanical layouts
Engineering and energy
- Structural calculations, prepared and stamped by a licensed engineer
- Title 24 energy compliance report. California’s 2025 Energy Code took effect January 1, 2026.
- CALGreen (Green Building Code) notes
- Grading, drainage and stormwater (BMP) notes when the site calls for them
Forms and agency reviews
Cities add their own forms. Irvine, for example, asks for an ADU application, a development standards checklist, a hold harmless form, a recorded covenant, a school fee determination form and a Transportation Corridor Agency form, all submitted through its online portal. Many ADUs also get a fire department review for access, hydrant distance and water flow. School fees apply only to ADUs over 500 sq ft.
How long the city has to review it
State law gives the city 15 business days to decide whether an ADU application is complete and 60 days to approve or deny a complete one (Gov. Code 66317). Corrections are part of the process; a well-coordinated set keeps the rounds short. We don’t promise approval dates, but we track every comment until the permit is issued.
Why coordination matters
Most plan check corrections come from drawings that don’t agree with each other: a window on the floor plan that’s missing from the elevation, a beam sized for a different opening, a panel location that conflicts with a new wall. Our sets are drawn to be built and reviewed sheet against sheet before they go to the city.
What our ADU package includes
Our flat-fee ADU package covers architectural, structural and MEP plans, Title 24 and CALGreen documents, and the city submittal with plan check corrections, starting with a site visit and a layout you approve first.
Talk it through with us
Every property is different. Book a free consult or call (949) 659-4426, and we’ll look at what your lot allows.
Sources: LADBS ADU building permit checklist, City of Irvine: ADUs, California Energy Commission: 2025 Building Energy Efficiency Standards, HCD ADU Handbook (March 2026). Based on information available as of November 2026. Rules change, and local rules apply on top of state law; this article is general information, not legal advice for a specific property.