Remodels
Kitchen, bath and whole-home remodels, planned before the walls come down.
Interior reconfigurations, wall removals and full remodels with the structural, plumbing and electrical impacts worked out on paper first.
What we design
Better layouts inside the house you already have.
- Kitchen and bath remodels that need permits
- Opening walls, including load-bearing walls with engineered beams
- Whole-home reconfigurations
- Legalizing past unpermitted work
Why it matters
Fewer surprises once demolition starts.
We document existing conditions first, then flag what needs engineering, which plumbing and electrical runs move, and whether the panel needs an upgrade. Your contractor gets drawings that answer their questions before they price the job.
Questions
Does a remodel need plans?
Moving walls, plumbing or electrical, or changing structure usually needs a permit, and the city will want drawings. Cosmetic updates often do not.
Can you remove a load-bearing wall?
Often, yes. We design the new opening and coordinate the beam, posts and footings with a licensed structural engineer.